14 Bend-Tech Dragon A400
Powered Gate Retrot Guide
Installation Guide
02
3. Mount New Control Box
Important
The new Control Box will have a separate Powered Gate Driver Box attached to
it. This Powered Gate Driver Box contains the motor driver for the Powered Gate.
The Powered Gate Driver Box is placed on top of the main Control Box once it is
mounted to the third Rail Support Leg.
Before mounting the new Control Box, the Installer will need to remove the red Breakout Board
located in the upper left hand corner of the new Control Box. Carefully pull the Breakout Board
out of its mount on the motor drivers. Leave the Breakout Board connected to the door of the
Using the Mounting Bolts and nuts from the old Control Box, position the new Control Box
so the Mounting Bolts can be fed through the mounting holes in the Control Box and the
Rail Support Leg. Once in position with a Mounting Bolt fed through both parts, thread a nut
socket placed on the bolt head inside the Control Box to tighten the Mounting Bolts securely.
4. Reinstall the Breakout Board
After mounting the Control Box, reinstall the Breakout Board. Position the Breakout Board over
the motor drivers and carefully press the Breakout Board into its sockets on the motor drivers.
Ensure the Breakout Board is fully seated on the motor drivers. Take care not to alter any of
the white dip switch settings as these are preset at the Bend-Tech manufacturing facility for
optimum performance.
Important
into place.