02
5. Place Powered Gate Driver Box
The Powered Gate Driver Box should be placed
on top of the main Control Box. The Powered Gate
Driver Box is secured with pre-installed Velcro.
Connect the C-Axis Motor Cable to the Gate
connection on the Control Box.
6. Control Box Connections
Transfer all cable, wiring and compressed air
connections from the old Control Box to the new
Control Box. Bend-Tech recommends starting at
either the top or bottom of the old Control Box and
transfer each connection individually. Using this
method will avoid misconnections.
! Warning !
Do not power on the new Control Box at this time.
Gate Modication
Tools Needed
• 17mm Socket and ratchet
• ¾ in. thin wrench
•
extension
• ¼ in. Allen wrench
•
•
Parts Required
• Powered Gate Mount Plate (1)
• Powered Gate Ring Gear (1)
• Stainless Steel Gate Rollers (4)
• Loctite Blue 242
Dragon A400 machine and modifying it to work as a Powered Gate. Bend-Tech recommends
the Installer enlist help when removing and installing the Gate assembly.
Cable to
C Axis Motor
Powered Gate
Driver Box