EasyManua.ls Logo

Bender AGH675S-7 - Page 20

Bender AGH675S-7
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Function
20
IRDH275BM-7_D00123_06_M_XXEN/07.2018
An insulation fault between the IT system and earth closes the measuring cir-
cuit. From the measured current value, the microprocessor calculates the in-
sulation resistance which is indicated on the LC display or the external kΩ
measuring instrument.
The measuring time t
an
is determined by the system leakage capacitances, the
insulation resistance, and the system-related interference disturbances. Sys-
tem leakage capacitances do not influence the measuring accuracy. When vir-
tually no disturbances are caused by the operation of converters, the
measuring process takes about five minutes.
If the reading is below the selected response values Alarm 1/Alarm 2, the as-
sociated alarm relays respond and the alarm LEDs "Alarm 1/2“ light up and the
measuring value is indicated on the LC display (in the event of DC insulation
faults, the faulty supply line is indicated). If the terminals R1/R2 are bridged
(external RESET button [NC contact] or wire bridge), the fault indication will be
stored. Pressing the RESET button, resets the insulation fault message, provid-
ed that the currently displayed insulation resistance is at least 25 % above the
actual response value when the reset is carried out. The fault memory behav-
iour can also be set in the "ISO SETUP" menu, by selecting the sub menu Mem-
ory: on/off.
The connections for an external kΩ display supplied by the current output
0(4)…20 mA at M+/M- are galvanically isolated.
*) measuring principle "adaptive measuring pulse", a measuring
principle developed by Bender (European Patent: EP 0 654 673 B1).
AMP
Plus

Table of Contents

Related product manuals