CommissioningCommissioning
iso685-D-P_D00170_00_M_XXDE/06.2016
35
7.4 Commissioning EDS
Proceed as follows to put into operation an EDS after commissioning the ISOMETER®:
1. First, search for all available measuring channels.
Menu path: Menu/EDS/Scan channels.
2. Activate all or only selected measuring channels. Additionally, select the required
menu item, confirm your selection with "OK" and start activation with
Menu path: Menu/EDS/Activate channel.
3. Test if the maximum locating current to the EDS is correct and adjust if necessary
(refer to 7.2.6 “Setting EDS current” on page 34).
Menu path: Menu/EDS/General/Current
In addition to this chapter, commissioning of the ISOMETER® in combination with an EDS
is described in the “Commissioning flow chart” on page 32.
Channel
√ BB-Bus
BS-Bus
33 %
Scanning channels 2.2
Search for
EDS channels?
Cancel Start
Channel
√ BB-Bus
BS-Bus
33 %
Activating channels 2.3
Select all
No selection
Invert selection
Channel 1
Channel 2
Current
6.6.9
o 1mA
o 1.8mA
o 2.5mA
o 5mA
• 10mA