EasyManua.ls Logo

Blastrac 500 E Global - 7.3 Repairing

Blastrac 500 E Global
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Instructions 500 E Global
Maintenance
4
7.3 Repairing
As already mentioned in Chapter 5 “Initial operation” we recommend
to execute the first repair works on the machine with the help of
Blastrac personnel. With this your maintenance personnel gets the
opportunity to be trained intensely.
Only those repair works are described which occur within the context
of maintenance or which are required to replace wear parts.
If you replace parts yourself for specific reasons, the following
instructions and work sequence have to be observed.
You should also stock all spare or wear parts that cannot be supplied
quickly. As a rule, production standstill periods are more expensive
than the cost for the corresponding spare part.
Screws that have been removed must be replaced with those of the
same quality (strength, material) and design.
Prior to any repair works on the machine and its drives, secure the
machine against unintentional switching-on. Pull out the mains plug
in order to do this.

Table of Contents

Related product manuals