EasyManua.ls Logo

Brooks 8200 - The Compressor

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection 8200 Compressor
The Compressor Installation, Operation, and Service Instructions
8040353 Brooks Automation
3-2 Revision AA
The Compressor
On receipt, remove the 8200 Compressor from its shipping carton and inspect the
compressor for evidence of damage as described in this Section.
1. Unpack and remove the compressor from its shipping carton.
2. Check the carton contents. It should contain:
a. 8200 Compressor (air cooled or water cooled).
b. Compressor Manual part number 8040353.
3. After unpacking, inspect the compressor for evidence of damage as follows:
c. Inspect the compressor overall exterior for damage.
d. Report damage to the shipper at once.
e. Retain shipping cartons for storage or return shipment.
When installing your system, BROOKS recommends that as you unpack a
component, you perform an inspection and the necessary tasks for system
installation for the component according to the manual included with the com-
ponent. Final system installation and operation will be performed following
procedures in the high-vacuum pump or refrigerator manual.
4. Check the helium pressure gauge. The gauge should indicate 250 psig (1725
kPa) minimum at 70°F. If additional gas pressure is required, follow the
instructions in Helium Circuit Decontamination on page 5-9.

Table of Contents