EasyManua.ls Logo

Brooks 8200 - Unscheduled Maintenance

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Procedures 8200 Compressor
Unscheduled Maintenance Installation, Operation, and Service Instructions
8040353 Brooks Automation
5-6 Revision AA
Unscheduled Maintenance
Suggested Unscheduled Maintenance Equipment
It is advisable to keep on hand the unscheduled maintenance equipment and dispos-
able supplies listed below.
1. Helium, 99.999% pure.
2. Pressure regulator (0-3000/0-400 psig).
3. Maintenance manifold, part number 8080250K003*.
4. Helium charging line terminating in a 1/4-inch female flare fitting, part num-
ber 7021002P001.
5. Installation and Scheduled Maintenance Tool Kit, part number 8032040G004.
*Available from stock; consult the factory or your sales representative.
Adding Helium Gas
Use only 99.999% pure helium gas.
If the compressor helium pressure gauge reads 0, decontamination is required. Refer
to the Helium Circuit Decontamination on page 5-9, or contact the Product Service
Department.
1. A user-supplied helium charging line terminating in a 1/4-inch female flare fit-
ting, and a two-stage pressure regulator rated at 0-3000/0-400 psig is required
for this operation.
2. If you need to add helium more than once every several months, check for
leaks caused by improperly connected self-sealing connections or any mechan-
ical joint within the compressor.
Equipment Damage
To avoid damaging the cold head and other parts through contamination,
maintain pressure in the cold head.

Table of Contents