WORK STEP ILLUSTRATION / OTHER INFO
Preparation: Determine, whether a
cautious and careful handling of the CPM
(possibly in packaging) is possible.
You
thereby avoid transport damage to the
CPM.
Make sure, that routes for the manual transport are free (no
tripping hazards) and provide sufficient space!
Lifting: Lift the CPM taking into
consideration the weight, the dimensions
and the center of gravity.
Handling and Transport: Make sure, that
you can safely hold the CPM while working.
Caution when placing the CPM down on smooth surfaces or
if the CPM slips out of the packaging.
Setting down: Place the CPM (possibly in
packaging) on a level surface.
Ensure compliance with the conditions in section 12.5.8 for
storage or transport of the CPM.
Storage: Store the CPM (possibly in
packaging) horizontal on a level surface.
Place the base area of the CPM (possibly
in packaging) completely on the storage
surface.
Avoid damage to the CPM due to
incorrect storage.
Ensure compliance with the conditions in section 12.5.8.1 for
storage of the CPM.
12.7.6 Installation of the CPM
DANGER
Danger to life!
Before commencing work, ensure zero voltage in the HV-circuit!
Follow the prescribed work sequence without fail!
Do not act recklessly and impetuously under any circumstances!
INFORMATION
Visually inspect the packaging material and in particular the CPM itself for
installation. At BRUSA every CPM undergoes a strict quality-
and function control before delivery.
However we have no influence on the long transport routes in some cases and the loading activities
of our products.
WORK STEP ILLUSTRATION / OTHER INFO
61
Operation Manual
Inductive Charging System
ICS115