EasyManuals Logo

Bryant Evolution Connex Control SYSTXBBECC01-C User Manual

Bryant Evolution Connex Control SYSTXBBECC01-C
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #63 background imageLoading...
Page #63 background image
63
6.4.9.3. Zone Duct Assessment
This screen shows the results from the previous duct assessment. The
duct assessment is performed at initial start-up and at 1 P.M. or the
installer selected time each day. If another duct assessment is desired, the
service technician should perform a re-install of the system.
NOTE: A Duct Assessment will automatically occur every 24 hours at
selected time to check system static and calibrate dampers.
Once the duct assessment is complete, touch DONE to return to the
ZONING CHECKOUT menu.
6.4.9.4. Sensor Type
This option shows a list of all zones with corresponding sensor types.
6.5. Service Information
The Service Info menu will only show the equipment installed in the
system. To enter this menu of options, touch SERVICE
INFORMATION.
A13123A

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Bryant Evolution Connex Control SYSTXBBECC01-C and is the answer not in the manual?

Bryant Evolution Connex Control SYSTXBBECC01-C Specifications

General IconGeneral
BrandBryant
ModelEvolution Connex Control SYSTXBBECC01-C
CategoryThermostat
LanguageEnglish

Related product manuals