15
END OF INSTALLATION STAGE 4
BEFORE STARTING STAGE 5 - Commissioning the Control Panel
PLEASE CHECK THAT YOU HAVE CORRECTLY:
Ref Page
1. Wired the Motors 4.1 12
or
4.2 13
2. Made the electrical connections 4.3 14
NOW STAGE 3 IS FULLY COMPLETED YOU ARE READY TO BEGIN
STAGE 4 OF YOUR FAST AUTOMATION KIT INSTALLATION.