Installing the Zone Ctrl II and VAV Zone II Secondary Duct into the i-Vu® application
Zone Ctrl II and
VAV Zone II Secondary Duct Installation and Start-up Guide CARRIER CORPORATION ©2019
Error! No text of specified style in document.
30 All rights reserved
Dual duct control programs using the Zone Ctrl II and a VAV Zone II Secondary Duct
• Constant Volume Dual Duct (Cold Deck and Hot Deck Airflow Sensing)
• Constant Volume Dual Duct (Cold Deck and Total Airflow Sensing)
To create your control program in EquipmentBuilder
1 Start EquipmentBuilder. (Windows
>
>
)
2 Click
and then click
.
3 Select the ivu-x.x-universal-controller.sal library from the
drop-down
list.
4 Select the equipment type from the list and click
.
5 In the
field, edit the name, if desired.
Your name must not exceed 21 characters.
6 Select options on the
tab and, if applicable, edit setpoints on the
tab.
The
and
tabs change based on your choices on the
tab.
7 Click
.
8 Check the files you wish to generate from the list.
9 Check to select saving your control program files to a folder of your choice or a folder linked to a system.
10 Click
.
To edit an existing control program in EquipmentBuilder
1 Start
. (Windows
>
>
)
2 Click
and browse to the .equipment file that you want to edit. and click
.
○ If using i-Vu® Standard or Plus, you must first save your control program to your computer from the i-
Vu® interface, using the right-click
window.
○ If using i-Vu® Pro, navigate to the webroot/<system>/programs folder.
3 In the
field, edit the name, if desired.
Your name must not exceed 21 characters.
4 Select options on the
tab and ,if applicable, edit setpoints on the
tab.
The
and
tabs change based on your choices on the
tab.
5 Click
.
6 Check the files you wish to generate from the list.
7 Check to select saving your control program files to a folder of your choice or a folder linked to a system.
8 Click
.
See i-Vu® Help for instructions on how to apply your new or edited control programs to controllers in your system.