EasyManua.ls Logo

CENTURION SYSTEMS D5 SMART - New Site Installation Preparation

CENTURION SYSTEMS D5 SMART
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
page 13 www.centsys.com
NEW SITE INSTALLATION PREPARATIONSECTION 5
5. New Site Installation Preparation
5.1. General Considerations for the Installation
Alwaysrecommendthetmentofadditionalsafetyequipmentsuchassafetyedges
and safety beams, for additional protection against entrapment or other mechanical
risks.
Check that no pipes or electrical cables are in the way of the intended installation.
Checkthatenoughspaceisavailableforthegateoperator,specicallyfortherelease
handle (See Section 7.1.2. - "Minimum Clearances").
Check for loose, sandy soil if installing a foundation, as the soil condition may require
a larger foundation.
Neverttheoperatorontheoutsideofthegate,wherethepublichaveaccesstoit.
Install the gate operator only if:
It will not pose a hazard to the public
Thereissucientclearancetoaroadwayand/orpublicthoroughfares
The installation meets all municipal and/or local authority requirements once completed
Thegatemassandapplicationarewithintheoperatorspecications
The gate is in good working order, meaning:
that it opens and closes freely;
does not move on its own if left in any position;
itcanbeinstalledtohavesucientclearancebetweenmovingpartswhen
opening and closing to reduce the risk of personal injury and entrapment;
Pushbuttons or key-switches, when required, can be positioned so that the gate is in
line-of-sight of the user

Table of Contents

Related product manuals