EasyManua.ls Logo

CENTURION SYSTEMS D5 SMART - General Maintenance

CENTURION SYSTEMS D5 SMART
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
page 54 www.centsys.com
9. General Maintenance
GENERAL MAINTENANCESECTION 9
9.1. Gate Maintenance
9.1. D5 SMART Maintenance
Description Frequency Corrective Action
Ensure that the gate
track is clear of debris
at all times
Daily
Clean around the gate and gate
operator. Consider installing gate
brooms on the bottom of the gate
Ensure that the
endstops are sturdy
and secure
Every 3 months
If the endstops are damaged or loose,
contact an installer to replace
Check that the rack is
securely mounted to
the gate over its full
length
Every 3 months Contact installer
Contact an installer to
inspect and verify that
all safety equipment,
e.g. safety beams, is
functioning correctly
Every 6 months N/A
Ensure that the gate
moves smoothly when
in Manual Override.
Check wheels and
guide-rollers for signs
of wear
Every 6 months
Place the motor in Manual Override
and manually open and close the gate.
If the wheels and/or guide-rollers
are excessively worn, contact an
installer to replace
Check the track for
damage or corrosion
Every 6 months
If the track is damaged, contact an
installer to replace
If pedestrian gate /
emergencygateistted
within the main gate,
ensure that the lock
operates smoothly
Every 6 months Dry lubricate if necessary (graphite)
TABLE 3

Table of Contents

Related product manuals