EasyManuals Logo

CE+T Power T2S-ETH User Manual

CE+T Power T2S-ETH
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
3.4 Maintenance
The modular inverter system/rack can reach hazardous leakage currents. Earthing must be carried out prior to
energizing the system. Earthing shall be made according to local regulations.
Prior to any work conducted on a system/unit make sure that AC input voltage and DC input voltage are
disconnected.
Inverter modules and shelves contain capacitors for filtering and energy storage. Prior to accessing the system/
modules after power down, wait at least 5 minutes to allow capacitors to discharge.
Some components and terminals carry high voltage during operation. Contact may result in fatal injury.
3.5 Replacement and Dismantling
ESD Strap must be worn when handling PCBs and open units.
CE+T cannot be held responsible for disposal of the Inverter system and therefore the customer must segregate
and dispose of the materials which are potentially harmful to the environment, in accordance with the local
regulations in force in the country of installation.
If the equipment is dismantled, to dispose of its component products, you must comply with the local regulations
in force in the country of destination and in any case avoid causing any kind of pollution.
To download the latest documentation and software, please visit our website at
www.cet-power.com
10 – Monitoring T2S - ETH User Manual – v1.4
Warranty and Safety Conditions

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CE+T Power T2S-ETH and is the answer not in the manual?

CE+T Power T2S-ETH Specifications

General IconGeneral
BrandCE+T Power
ModelT2S-ETH
CategoryIndustrial Equipment
LanguageEnglish