34
21. The Installation Supervisor must
inspect the position, level and
proper connection of the piping
connections.
22. Steam supply and condensate
unions must be tight.
23. Drain piping must be checked.
24. Cross-owhosesmustbe
inspected and clamps tightened.
25. Flushing nozzle piping on the
load end must be inspected.
Installation Instructions
Section Assembly
Section Assemby