98-175666-D 2-1
Chapter 2
Installation 2
This chapter has the following sections:
• What’s in the box
• Site considerations
• Installation of the ADU (S1000 antenna)
• Installation of the ADU (S600 antenna)
• Installation of the BDU
• Installation of the 7023A GX Modem Unit (CX-751)
• Installation of the 7523A GX-R2 Modem Unit (SMB3315)
• Integration of a 3rd party IP device
• Power and startup
2.1 What’s in the box
2.1.1 To unpack
Unpack the ADU and BDU. Check that the following items are present:
• SAILOR ADU
• Accessory kit for SAILOR ADU:
• Package with bolts and washers
• SAILOR 7516A BDU
• Accessory kit for SAILOR 7516A BDU:
• Coax cable F-F, low loss, 75 Ohm (100 cm, 2 pcs)
• Power cable (230 VAC) with Schuko (Euro) wall plug
• Terminal block (DIN Rail Adapter for RJ-45 connector)
• SAILOR 7023A or 7523A GMU
• Accessory kit for SAILOR 7023A GMU:
• Wiecon 3.5 mm spacing, 4 pol connector for cable
• RJ-45 patch cable (1 pce)
• Power cable 230 VAC
• RS-232/RS-422 cable (2 pcs)
• Accessory kit for SAILOR 7523A GMU:
• Power cable 230 VAC
• SMA-F adapters (2 pcs)