EasyManua.ls Logo

Columbus Instruments CLAMS - Page 59

Default Icon
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
59
CLAMS Hardware Manual 1012-0001 v1.01
Position the assembly near the UGC and use an appropriate length of 1/8” red air line to connect the
down-stream port of the filter (the end with the particle filter) to the “Sample” port of the UGC.
Using an appropriate length of 1/8” red air line, connect the up-stream port of the filter (the end with
an ammonia trap) to the “Test Out” port of the Universal Flow Controller.
Assembling the Zero Gas Source
Locate the Zero Gas Supply Assembly. It consists of 6 meters (20 feet) or more of natural 1/4" air line
joining with a male quick-connect fitting plug and a yellow ruby restrictor.
Connect the free end of the air line to the “Zero Gas” port of the UGC.