Preparing for Installation
The Carousel Plus W Series Dryer is easy to install if you plan the location and
prepare the mounting area properly.
1 Make sure the mounting area provides:
A grounded power source supplying the voltage and correct current
for your dryer model. Check the dryer’s serial tag (on the side of your control
box) for the correct amps, voltage, phase, and cycles. Field wiring should be
completed by a qualified personnel to the planned location for the dryer. All
electrical wiring should comply with your region’s electrical codes.
A source of water, for the aftercooler and/or the optional precooler.
The Carousel Plus W Series dryer’s aftercooler and optional precooler can
use 2 gals./min. {7.6 liters/min.} tower, city, or chiller water at temperatures
of 45° to 8F{ to 29°C}. Pipe should be ran to the planned dryer location.
Use flexible hose to connect the water pipes to the aftercooler and/or
precooler.
Minimum clearance for safe operation and maintenance.
You should maintain 24 in. {61 cm} clearance on all sides of the dryer.
3-4 l Inst al la tion
If you plan to use vacuum or
compressed air loaders to fill
the hopper, install conveying
lines to the drying hopper
location.
Positioning the Dryer on the Floor
1 Lift the dryer from the shipping container using a fork truck.
2 Position the dryer on the floor near the processing machine. Make sure the
location allows for the connection of all hoses.