3-6 l Inst al la tion
Connecting the Process RTD Probe
The process RTD probe monitors the temperature of the drying air as it enters the
hopper. If the probe is not installed correctly, temperature readings will be inaccurate.
1 Insert the probe at the inlet to the
hopper. The end of the probe must not
touch the walls of the tube. The tip of the
probe should be approximately in the cen-
ter of the tube. Tighten the compression
fitting to lock the probe in place.
2 Plug the probe’s
cable into the
receptacle labeled
process on the
left side of the
electrical
enclosure. Hand
tighten the
connector. Coil
any excess cable
and secure it with
a wire tie.
Connecting the Setback RTD Probe
1 Insert the probe in the hopper outlet at the top of the hopper. The end of the
probe must not touch the walls of the tube. The tip of the probe should be
approximately in the center of the tube. Tighten the compression fitting to lock
the probe in place.
2 Plug the probes cable into the receptacle labeled setback on the left side of
the electrical enclosure. Hand tighten the connector. Coil any excess cable
and secure it with a wire tie.
When configured as
a central dryer, there
is no process heater
or process RTD in
the system.
Therefore, installa-
tion and connection
of the RTD probe
and/or setback probe
is not applicable.
Central