EasyManua.ls Logo

Cumberland EDGE 2 System - Chapter 5 Expansion Box and Virtual Expansion Box Installation; Preparing the Enclosures for Installation

Cumberland EDGE 2 System
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Expansion Box and Virtual
Expansion Box Installation
Topics Covered in this Chapter
Preparing the Enclosures for Installation
Mounting the Enclosures
Installing the Plug-In Modules
Installing the Plug-In Relays
Installing the EDGE Variable Output
Installing the EDGE 4IN-2V-8DO Before Wiring
DC Network and Power Supply Redundancy
Connecting a Module to the Communication Network
Connecting an Analog Input
Connecting a Variable 0-10 VDC Output
Grounding
Connecting the Power Supply
Connecting Relay Outputs
Connecting an EDGE Variable Output module (SSR)
Connecting an AC Power Source for Light Dimmer Output
Connecting Light Dimmer Output
Lamp Fixture Grounding
Connecting Discrete Outputs
Connecting the Current Sensors of Discrete Outputs
Preparing the Enclosures for Installation
Preparing the equipment before mounting it to the wall facilitates manipulation and ensures all parts are
ready to be installed.
Before You Begin
The following figures illustrate how to install the wires in the plastic enclosure. Wires are separated into
two groups: low voltage and high voltage.
NOTE: The use of rigid conduits up to 2 inches (50.8 mm) is allowed for the EDGE 3-Slot Expansion Box
and the EDGE 6-Slot Expansion Box.
890–00687 EDGE 2
59

Table of Contents