EasyManuals Logo

CYBELEC DNC 60 GS User Manual

CYBELEC DNC 60 GS
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
PAGE 18 USER GUIDE DNC 60 GS
P
RODUCTION PAGE
Choice 1 of the main menu.
There are 9 of these pages.
They contain information on the production times by managing four counters.
CONSULTING THE PRODUCTION PAGE
The production page is accessible via the
PRODUCTION
choice of the main
menu.
It allows to load and display an order.
PAGE 1 __
-- PRODUCTION LIST --
WEEK 25/92
OPERATOR N 5 PRIORITY 2
ORDER N 123.354 DATE 8/ 7/92
CODE ITEM V379 CUST.R591 PRODUCT 222
QUANTITY REQUIRED REALIZED
800 221
MATERIAL: Thickness __.__ mm
Rake angle __.__ °
material Kg/mm² ___.___
REQUIRED REALIZED
PRODUCTION TIME: 24h 35min 25h 18min
TOOLS ADJUST. TIME: 2h 45min
PRODUCT SET UP: 5h 0min
PROGRAMMING TIME: 1h 30min

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CYBELEC DNC 60 GS and is the answer not in the manual?

CYBELEC DNC 60 GS Specifications

General IconGeneral
BrandCYBELEC
ModelDNC 60 GS
CategoryControl Systems
LanguageEnglish

Related product manuals