THRESHING TREATMENT LEVER
(1) Standard position of threshing treatment
E32O701A
417O709A
(1) Auxiliary Cover (2) Buttery Nut
AUxILIARY COVERS
Turn the holding rods and let the
back auxiliary cover down. Then,
turn the butterfly nuts to fix the
back cover to the side auxiliary
covers.
•
CAUTION
(1) Straw Conveyer Cover
(A) Open
417O710A
STRAW CONVEYER COVER
Open the cover before the straw
cutter.
•
CAUTION
At the beginning of work, move
the lever standard. And adjust the
lever according to the condition of
threshing work.