EasyManua.ls Logo

Daikin Sky Air R-407C - 4-way Valve Control

Daikin Sky Air R-407C
304 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESIE02–01 Overview of the heating mode functions
Part 2 – Functional Description 2–45
3
2
4
5
1
3.6 4-way Valve Control
Applicable units RYP71-250B
Purpose The purpose of the 4-way valve control is to control how the superheated refrigerant passes through
the 4-way valve. The 4-way valve control carries out the changeover switching of the 4-way valve. This
changeover switching is only carried out during operation, because pressure difference is required to
move the internal cylinder.
Method The table below describes the 4-way valve control operation.
Time chart The time chart below illustrates the 4-way valve control.
Used input The 4-way valve control uses the following inputs:
When... Then the 4-way valve connects the outlet of the compressor with...
Cooling Outdoor heat exchanger.
Heating Indoor heat exchanger.
In... The 4-way valve is...
Heating, except for defrosting ON
Cooling
Dry keep
Defrosting
OFF
Compressor
4-way valve
Defrosting
Unit mode
ON
OFF
OFF
ON
OFF
ON
Heating
Cooling / dry keep
Input
Connection on
indoor PCB
Connection on
outdoor PCB
Indoor air temperature R1T (auto changeover) X19A
Outdoor heat exchanger temperature R2T (defrost) X5A

Table of Contents

Related product manuals