GB
PL
DANFOSS HEATING 17
General Operation
The TP9000 has two distinct display modes - one for Hot Water, one 
for Central Heating. The currently selected 
mode is indicated by a bar at the bottom 
of the LCD screen when in run mode. The 
right bar is for Heating, the left bar is for Hot 
Water.
When programming the TP9000 it is 
important to be aware of which mode is active before beginning 
programming. To toggle between modes, press the CH/HW button. 
The display will change and the indicator bar at the bottom will move 
to refl ect which mode is selected. The fl ame (
) and tap ( ) symbols 
are used in conjunction with the LED’s to show the current output 
status (on/off  ). The output status is always shown for both Heating and 
Hot Water regardless of the display mode.
Preset programmes 
Your TP9000 comes ready programmed with a set of operating times and 
temperatures which suit most people. Please remember that some of the 
options available will depend on how the installer has set up the unit.
Weekdays (Mon-Fri)  Weekend (Sat-Sun)
Event  Time  Temp. °C  Event  Time  Temp. °C
1 06:30  20  1  07:30  20
2 08:30  15  2  09:30  20
3 11:30  20  3  11:30  20
4 13:30  15  4  13:30  20
5 16:30  21  5  16:30  21
6 22:30  15  6  22:30  15
Note: these are also times for 
Block “A” programmes
Note: these are also times for 
Block “B” programmes
Central Heating
Note: If set up for 4 events per day, events 3 & 4 are skipped. If set up 
for 2 events per day, events 2, 3, 4 & 5 are skipped. In both cases the 
events are re-numbered.