EasyManua.ls Logo

Datascope Passport 2 - Page 48

Datascope Passport 2
155 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Power Supply Theory of Operation
2 - 38 0070-10-0441 Passport 2®/Passport 2 LT™ Service Manual
The Power Supply also provides a BATT-CHARGE output signal that is a logic “1” when
either charger is active (i.e. batteries are actually being charged). Otherwise, BATT-
CHARGE will be a logic “0”. In addition, the signal will be logic “0” if there is a charger
fault, such as open/shorted cell(s). The BATT-CHARGE output is capable of driving an
external LED, sourcing a minimum of 10mA.
During BATTERY operation (i.e. AC and DS-DC powers are not present), the power supply
latches off when the BATTERY voltage drops below 10.3V for SLA and 9.2V for Li-Ion. The
power supply unlatches when any one of the following occurs:
•The REMOTE-ON* signal is toggled off and on, provided that valid input power (AC,
DS-DC, or BATTERY) is present.
AC or DS-DC power is applied.

Table of Contents

Related product manuals