EasyManuals Logo

Dell EMC Unity Series Field Upgrade Procedure

Dell EMC Unity Series
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
Figure 8 Removing an enclosure from rails 49" or less above the floor
CL5432
a. Place the strap around the lift and the enclosure.
b. Insert the free end of the securing strap into the slot on the ratchet
mechanism. Pull the ratchet handle down to tighten the securing strap
around the lift and the enclosure. Refer to Tightening the Straps
Figure 9
Tightening the Straps
1 2
CL5429
c. Make sure the enclosure is securely strapped to the lift before moving.
Lower the lift to its lowest point of travel.
This allows the enclosure to be moved with minimal danger of tipping over.
Field Upgrade Procedure
16 Unity All Flash and Unity Hybrid Field Upgrade Procedure

Other manuals for Dell EMC Unity Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell EMC Unity Series and is the answer not in the manual?

Dell EMC Unity Series Specifications

General IconGeneral
Snapshot SupportYes
Storage TypeHybrid Flash, All-Flash
Drive SupportSAS, SSD
ProtocolsiSCSI, NFS, SMB
Data ServicesSnapshots, Replication, Thin Provisioning, Deduplication, Compression
ManagementUnisphere, REST API, CLI
Data Reduction FeaturesDeduplication, Compression
High AvailabilityRedundant components
Redundancypower supplies, fans
RAID Levels SupportedRAID 5, RAID 6, RAID 10
Replication SupportYes
Cloud TieringYes
Security FeaturesEncryption at rest, secure erase, role-based access control
ModelDell EMC Unity Series

Related product manuals