EasyManua.ls Logo

Dell PowerVault ML6010 - Page 105

Dell PowerVault ML6010
216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing, Removing, and Replacing
file:///T|/htdocs/stor-sys/ML6000/en/html/ch08.htm[9/17/2012 1:50:35 PM]
1 Ethernet cable to network
2 GB Ethernet port
3 Power supply
4 Rear power switch
5 Power cords
6 Fibre cables to host
7 Module terminators
8 Library control blade (LCB)
9 Module-to-module cable
Warning: All libraries taller than 14U must be installed in a rack having a main protective earthing
(grounding) terminal, and power must be supplied via an industrial plug and socket-outlet and/or an
appliance coupler complying with IEC 60309 (or an equivalent national standard) and having a protective
earth (ground) conductor with a cross sectional area of at least 1.5 mm
2
(14 AWG).
To ensure proper airflow and access space, Allow 60 cm (24 inches) in the front and back of the library.
Note: Pay attention to where the operator panel is positioned in the rack for optimum usability.
1 Install the library in a rack.
See
Installing the Library in a Rack for instructions. The instructions include procedures for removing and replacing
tape drives.
2 Connect the fibre cables to the tape drives.
a Attach one end of the fibre cable to the fibre port on each tape drive.
b Attach the other end of the cable to the host or switch.
Note: The fibre cable can be connected from the tape drive to a switch rather than a host.

Table of Contents

Related product manuals