Measuring and Marking Out Site
This should be undertaken at the beginning of each phase of the erection, using datums provided
on the installation layout. Checks should be made at this early stage to ensure the shelving fits the
building.
Use a chalk line to mark out the site.
Delivery and Unloading of Material
Deliveries will be made by suitable road vehicle, with attention being paid to the appropriate type of
handling equipment required to unload. Are there any restrictions on access? Is it possible for
vehicles to enter the building?
Erection Tolerance
The tolerance to which the racks should be installed needs to be specified by the rack designer in
accordance with the intended use of the racking. Frames must be assembled and installed to a
tolerance of 1/350 both across and down the aisle. (i.e. a 3500mm frame must be installed within
10mm of plumb).
Demarcation Areas
Work areas should be clearly marked warning that construction work is in progress, paying
particular attention to such hazards as ‘drop zones’, ‘hard hat areas’ etc.
Load Notices
These should be supplied with the rack material for fitting at regular intervals, in prominent
positions where they are clearly visible to all operators.
Inspection and Hand Over
An inspection should be carried out prior to obtaining the clients authorised signature and
‘Completion Certificate’.
Issue: June 2005 Section B – Construction Guidelines Page B.3