Operation Overview - 22 C16x/C24x/C30x Operator’s Manual
Plan
Plan
1. Gather information about jobsite. See page 33.
2. Inspect jobsite. See page 35.
3. Classify jobsite. See page 36.
4. Select best chain type and tooth pattern for your application. See page 72.
5. Consider optional equipment, if necessary. See page 74.
6. Check supplies and prepare equipment. See page 38.
7. Load unit onto trailer. See page 47.
Trench
1. Unload unit from trailer. See page 50.
2. Leave optional backfill blade, if equipped, in stowed position with digging boom low to ground. See
page 75.
3. Start unit. See page 40.
4. Drive to starting point of trench. See page 41.
5. Dig the trench. See page 54.
6. Shut down unit. See page 43.
Leave Jobsite
1. Restore the jobsite. See page 80.
2. Rinse unit and stow tools. See page 80.
3. Load unit onto trailer. See page 47.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch C16 Series and is the answer not in the manual?

Ditch Witch C16 Series Specifications

General IconGeneral
BrandDitch Witch
ModelC16 Series
CategoryFarm Equipment
LanguageEnglish

Related product manuals