Transport - 50 C16x/C24x/C30x Operator’s Manual
Retrieve
Unload
Prepare trailer
1. Park vehicle with trailer on level and firm ground.
2. Ensure trailer is correctly attached to vehicle.
Unload machine
1. Lower trailer or ramps.
2. Remove tiedowns.
3. If present, open fuel shut-off valve.
4. Start engine and set to low throttle.
5. Remove parking pin from parking position.
6. Pull boom control to raise digging boom, but keep it as low as possible.
7. Slowly back unit down trailer or ramps.
Retrieve
1. If machine becomes defective, repair on location or use lifting procedure to retrieve machine.
2. If machine cannot be repaired or lifted, contact customer support.
IMPORTANT: Use Ditch Witch S2B trailer for transport. If you use a different trailer, obey additional
instructions from the manufacturer.
Crushing weight could cause death or serious injury. Stay
away.
To help avoid injury:
• Keep all persons away from machine and trailer.
• Keep boom as low as possible during unloading procedure.
NOTICE: Machine is not approved for towing. Towing can damage components.
• Do not tow machine.