EasyManua.ls Logo

Ditch Witch JT5 - Page 37

Ditch Witch JT5
155 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Controls - 36 JT5 Operators Manual
ESID
CMW
®
6. OK indicator Green light means system
self test detected no
problems.
Strike system is ready to
operate.
7. Electrical power supply
indicator
Green light means control
box has sufficient electrical
power for operation.
Strike system is ready to
operate if OK indicator is also
on.
8. Self test button To start manual self test,
press.
To reset system after a strike
has been detected, press.
Checks all systems and circuits.
NOTICE: See “If an Electric Line is
Damaged” on page 18.
Item Description Notes

Table of Contents

Related product manuals