Operation Overview - 38 JT5 Operator’s Manual
Planning
CMW
®
Planning
1. Gather information about jobsite. See page 43.
2. Inspect jobsite. See page 44.
3. Classify jobsite. See page 46.
4. Plan bore path. See page 49.
5. Check supplies and prepare equipment. See page 55.
6. Load equipment. Seepage 62.
Setting Up at Jobsite
1. Prepare jobsite. See page 54.
2. Unload drilling unit from trailer. See page 64.
3. Assemble drill string. See page 73.
4. Position drilling unit and frame. See page 69.
5. Assemble strike system. See page 89.
6. Anchor drilling unit. See page 87.
7. Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.