EasyManuals Logo

Ditch Witch JT5 User Manual

Ditch Witch JT5
155 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #77 background imageLoading...
Page #77 background image
Conduct a Bore - 76 JT5 Operators Manual
Add Pipe
CMW
®
Add Pipe
1. Set engine throttle to full speed.
2. Clamp pipe joint. See “Clamp Pipe” on page 72.
3. Locate drill head.
4. Engage front wrench until pipe is clamped and pressure develops.
5. Slowly rotate spindle counterclockwise. Move carriage back as threads unscrew.
6. After threads are fully unscrewed, stop rotation and move carriage to back of frame, slowing down as
carriage approaches rear end.
7. Connect Pipe. See “Connect Drill Pipe” on page 74.
8. Ensure that pipe fills and fluid pressure begins to rise.
9. Rotate spindle.
10. Slowly move carriage forward. Adjust rotation speed control according to bit size and soil conditions.
11. Monitor gauges.
12. Locate drill head with tracker at least every half-length of pipe.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch JT5 and is the answer not in the manual?

Ditch Witch JT5 Specifications

General IconGeneral
BrandDitch Witch
ModelJT5
CategoryConstruction Equipment
LanguageEnglish

Related product manuals