Prepare - 52 Manual
Plan Bore Path
CMW
®
Entry Pitch
Entry pitch is the slope of the drill frame compared with the slope of the ground. Determine entry pitch one
of two ways:
1. With Pitch Beacon
Lay pitch beacon on the ground and read
pitch.
Lay pitch beacon on drill frame and read pitch.
Subtract ground pitch from drilling unit pitch.
2. With Measurements
Measure from the ground to front end of drill
frame (H1).
Measure from the ground to back end of frame
(H2).
Subtract (H1) from (H2). Record this number.
Measure the distance between front and back
points (C).
Divide (H2-H1) by (C), then multiply by 100.
This is your pitch.
Minimum Setback
Setback is the distance from the entry point to where
pipe becomes horizontal (B1).
IMPORTANT: A shallow entry pitch (A1) allows you
to reach horizontal sooner and with less bending.
Increasing entry pitch (A2) makes bore path longer
and deeper.
NOTICE: If setback is too small (B2), you will
exceed bend limits and damage the pipe.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch JT5 and is the answer not in the manual?

Ditch Witch JT5 Specifications

General IconGeneral
BrandDitch Witch
ModelJT5
CategoryConstruction Equipment
LanguageEnglish

Related product manuals