EasyManua.ls Logo

Ditch Witch JT5 - Check Supplies and Prepare Equipment; Check Supplies

Ditch Witch JT5
155 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual Prepare - 55
Check Supplies and Prepare Equipment
CMW
®
Check Supplies and Prepare Equipment
Check Supplies
• receiver/transmitter or tracker with spare batteries
• extra batteries for DrillLok™ remote, if equipped
• beacons with new and spare batteries
• two-way radios with new and spare batteries
• quick wrench (see page 107)
• transition sub
• anchoring equipment and accessories
• bits, screens, nozzles (see page 102)
• adapters, pipe, beacon housings
• marking flags or paint
• water and additional hoses
• fuel (Use low sulfur or ultra low sulfur fuel only.)
• drilling fluid additives (see page 96)
• spare fuses
• keys
• backreamers, swivels, pulling devices (see page 102)
• wash down hose and spray gun
• duct tape
• spray lubricant
• tool joint compound (see page 122)
• electrically insulating boots and gloves
• personal protective equipment, such as hard hat and safety glasses
• notepad and pencil

Table of Contents