This machine is not configured for lifting. If the machine must be lifted, load machine into a container or
onto a platform appropriate for lifting. See “Specifications” on page 145 for weight of machine.
Haul
Load
1. Start drilling unit engine.
2. Move drilling unit to rear of trailer and align with ramps.
3. Slow engine to low throttle and slowly drive unit onto trailer.
4. Lower drill frame and stabilizer to trailer floor. Keep tracks fully on trailer floor.
5. Stop engine when unit is safely positioned on trailer bed.
6. Attach tiedowns to drilling unit where indicated on page 63.
Crushing weight could cause death or serious injury. Stay
away. 275-326
To help avoid injury:
Load and unload trailer on level ground.
Verify that trailer wheels are blocked.
Incorrect loading can cause trailer swaying.
Attach trailer to vehicle before loading or unloading.
Ten to fifteen percent of total vehicle weight (equipment plus trailer) must be on tongue to help
prevent trailer sway.