EasyManuals Logo

Ditch Witch JT5 User Manual

Ditch Witch JT5
155 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #66 background imageLoading...
Page #66 background image
JT5 Operators Manual Transport - 65
Tow
CMW
®
Tow
Under normal conditions, drilling unit should not be towed. If unit breaks down and towing is necessary:
Attach chains to indicated tow points facing towing vehicle.
Disengage track hydraulics.
Tow for short distances at less than 1 mph (1.6 km/h).
Use maximum towing force of 1.5 times unit weight.
To disengage track hydraulics:
1. Loosen locknut (2).
2. Turn screw (1) on each counterbalance valve
clockwise until it stops.
3. Repeat on other track.
To engage track hydraulics:
1. Turn screw (1) on counterbalance valve
exactly the same number of turns
counterclockwise.
2. Tighten locknut (2).
3. Repeat on other track.
IMPORTANT: Be sure to count number of
turns.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch JT5 and is the answer not in the manual?

Ditch Witch JT5 Specifications

General IconGeneral
BrandDitch Witch
ModelJT5
CategoryConstruction Equipment
LanguageEnglish

Related product manuals