Prepare - 54 Manual
Prepare Jobsite
CMW
®
Prepare Jobsite
Mark Bore Path
Mark your planned bore path and all located utility lines with flags or paint.
Prepare Entry Point
For bore to be successful, first pipe must be straight as
it enters the ground.
To help ensure that the first pipe does not bend, dig a
small starting hole so that the first pipe is drilled into a
vertical surface.
To prevent bending or straining pipe, position drilling
unit for straight entry.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment. 274-050; 274-724 (2P)
To help avoid injury:
If jobsite classification is in question or if the possibility of unmarked electric utilities exists, classify
jobsite as electric.
Cutting high voltage cable can cause electrocution. Expose lines by hand before digging.
All vegetation near operators station must be removed. Contact with trees, shrubs, or weeds during
electrical strike could result in electrocution.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch JT5 and is the answer not in the manual?

Ditch Witch JT5 Specifications

General IconGeneral
BrandDitch Witch
ModelJT5
CategoryConstruction Equipment
LanguageEnglish

Related product manuals