Perform the following operations and checks every 6 months according to intensity of use of
the automation.
Disconnect the power supply, 230 V~:
- Maintenance and lubrication of the mechanical parts must be carried out with the door closed
(fully lowered).
- Make sure that cable and spring breakage device is in perfect working order.
- Check that the lifting cables are not worn.
- Make sure that the cables run smoothly in the drums.
- Periodically grease the hinges, ball-bearings, wheel pins, and torsional springs.
- Check for any obstacles that may hinder the wheels from properly running in the guides.
- To check the correct balancing of the sectional automation.
- Make sure that the overhead sliding structure is firmly fastened to the ceiling and perfectly free
from any defects, bending or buckling.
- Make sure that there are no loose bolts or screws.
- Absolutely avoid making any changes to the hoisting and/or sliding system.
Connect the power supply 230 V~:
- Limit switches are working properly;
- All control and safety functions are in good working order.
10. Routine maintenance plan
NOTE: for spare parts, see the spares price list.
For repairs or replacements of products only original spare parts must be used.
The installer shall provide all information relating to automatic, manual and emergency
operation of the motorised door or gate, and provide the user with operating instruc-
tions. The installer must prepare the maintenance log, which will indicate all the inter-
ventions of ordinary and extraordinary maintenance carried out.