Doc. #: M1800, Rev. 06
Page 9 of 101
www.opwglobal.com
NOTE: Local codes may dictate specific installation requirements.
Installation is subject to approval by the local authority having
jurisdiction at the site.
1.1.2 Precision Leak Test
A third-party precision leak test should be performed on each tank
and product line (especially older ones) before installing the Integra
console. This test ensures that leak data generated by the system is
accurate and reliable. A pressurized precision leak test can be
performed on a tank after the probe has been installed, but pressure
must NOT exceed 5 psi (0.34 bar).
NOTE: Most regulatory agencies will accept the ATG tank test as the
acceptance test on new tank installations; please confirm this with
your local agency before testing any tank.
1.1.3 Prior to Initial Inspection
Please refer to the initial Site Survey form and compare equipment
shipped equipment to the site survey.
NOTE: Not all Site Survey questions will require an answer; for all
unanswered questions, please respond with “N/A”. Do not leave any
field empty!
1.1.4 Initial Inspection
All packed items should be thoroughly inspected for damage that may
have occurred during shipping.
The console Data Sheet, which can be downloaded from the OPW
Global website at www.opwglobal.com, provides specific details
regarding the Integra tank gauge system. Store the data sheet and
OPW Manual CD in a secure location.
Please find the appropriate field wiring diagram in the product box, or
it can also be downloaded from the OPW website at
www.opwglobal.com, and give the field wiring diagram to your
installer or electrician.