Figure 9-3 Probe Level Indicators and Cable Installation
1. Install the Product Float – Slide the float over the probe rod from the bottom of the rod. Make sure the
magnet is facing toward the bottom end of the probe (for a Stainless-Steel Product Level Indicator
make sure the etched “UP” faces UP). If you are installing a product float only, skip to Step 3.
2. Install the Water Float (if applicable) - Slide the float over the probe rod from the bottom of the rod.
Make sure the magnet is facing toward the top of the probe (for a Stainless-Steel Water Level Indicator
make sure the etched “UP” faces UP).
3. Install the rubber boot by sliding it onto the end of the probe rod until it stops. Slip the C-clamp into the
slotted groove and push in until it snaps into place.
4. Install the probe cable. The probe-cable plug connector has a key slot that aligns with a corresponding
key tab in the probe tip. This allows the plug to fit in only one direction.
o Place the plug connector over the probe tip.
o Rotate the plug until you feel the connector key slot slide over the probe-tip key tab.
o Push the connector in all the way.
o Rotate the outer compressor ring of the connector until it is snug against the top of the probe.