Instructions for use | Atlan A100 (XL), A300 (XL), A350 (XL) SW 2.1n 125
Tests
7.5 Checklist in the walk-through mode
This section describes how the checklist is processed, using as an example a
device with an electronically controlled gas mixer, active AGS, O
2 sensor, and
factory defaults.
The scope of the checklist and the test steps displayed may vary due to differing
system settings.
The instructions on the screen take precedence.
Prerequisites
1. Connect the hoses (1).
2. Seal the Y-piece (2).
3. Set the APL valve to 30.
4. Close the flow control valve.
351023510035103
2
1