21
Figure 3-11 Fire Protection System Schematic Diagram
The maintenance of the fire protection system should comply with the fire codes and
regulations of the country/region where the project is located.
Fire protection equipment should be inspected and maintained regularly to ensure that
all functional indicators are normal.
Application Scenario
Peak-load shifting
This scenario is suitable for areas with significant price differences between peak and off-
peak electricity rates. Users can set peak and off-peak periods based on local time-of-use
pricing policies, their electricity usage patterns, and consumption levels. The energy
storage system charges during off-peak hours when electricity prices are low and
discharges during peak hours, effectively shifting electricity consumption in time and
reducing the user's electricity costs.
Power
Grid
Transformer
BESS
load
EMS
Meter
Charging during low tariff periods
Discharging during high tariff periods