DH200F User Manual
©Dyness reserves the copyright of this document.
4949
10 Appendix
In order to better serve users, the company provides a list of check items, please check
whether the following steps have been completed before the product runs.
No.
Check item
Yes/No
1
Check whether the appearance is damaged and
whether the internal equipment is intact
2
Check whether the cabinet assembly is firm
3
Check whether the logo of the cabinet body and
components is clear or damaged
4
Check whether the GRID wiring cables are connected
in the correct sequence of AC cables
5
Check whether the LOAD wiring cables are connected
according to the correct sequence of AC cables
6
Check whether the PV wiring cables are connected in
the correct sequence of DC cables
7
Check whether the communication cable connection
is complete
8
Check that the ground cable is faultless
9
Check if the meter reads correctly
10
Check that all connection points are connected
correctly and have good contact
11
Check whether the manual operation parts are
normal
12
Check whether the closing and opening of the circuit
breaker are normal
13
Check whether the operation of relevant buttons and
related indicators are normal
14
Check if the power light is normal
15
Check if the operation light is normal
16
Check whether the HMI screen is displayed normally
and no error is reported
17
Check for lost tools and parts inside the equipment
18
Check whether the cabinet door is closed and opened
flexibly