60 Eaton 9155 UPS (8–15 kVA) User’s Guide 164201553—Rev H0
Figure 44. Removing the Front Covers
2. Install the appropriate X-Slot card and/or necessary cable(s) into the top cabinet (see Figure 43 and
Figure 45).
Figure 45. Installing Communication Cables
3. On the bottom cover (and also the middle cover if 3-high), remove a knockout tab in the top edge of the
cover for each cable:
With wire cutters, cut either side of the tab and twist down to remove the tab (see Figure 46).
Communication