10
9A UPS 1-3K
B-Installaon
If you ordered other UPS accessories, refer to specific user manuals to check the
tower installation with the UPS.
1. Place the UPS on a at, stable surface in its nal locaon.
2. Do not block venlaon openings on the UPS’s housing. Ensure the air vents on the front,
side and rear of the UPS are not blocked. Recommended at least 25cm of space on each
side.
C-UPS Connecon
!
Check that the indicaons on the name plate located on the back of the UPS meets
to the AC-power source and the true electrical consumpon of the total load.
Hz
Vac
Hz
Vac
+
OUTPUT LOAD
INPUT BATTERY
ON OFF SELECT ENTER
9A
1