12
9A UPS 1-3K
B-Connecng the EBM
1. Plug the EBM power cable(s) into the baery connector(s). Up to 4 EBMs may be con-
nected to the UPS.
2. Verify that the EBM connecons are ght, and that adequate bend radius and strain
relief exist for each cable.
3. Aer wiring, you have to congure the number of EBM’s by the LCD, please refer to page
21.
3.4 UPS RACK 1-3KVA
A-Checking the accessory kit
Hz
Vac
Hz
Vac
+
OUTPUT LOAD
INPUT BATTERY
ON OFF SELECT ENTER
9A
1
1
2
3
4
5
6
2
3
4
5
6
UPS
Moun�ng kit for 19-inch
enclosures
Instruc�ons and Safety Informa�on
Quick start
Rack kit for 19-inch 4-post
enclosures
RS232 communica�on cable