9A UPS 1-3K
1. 9A1000I / 2000I: connect the UPS input socket (250V - 10A) to the AC-power source
using the cable of the protected equipment.
9A3000I: connect the cable
(250V - 16A) to the UPS input socket , then to the AC-power
source.
2. Connect the loads to the UPS using the cables of the protected equipment.
Connect the loads to the outlets marked
10A outlet. Connect any high-power devices to
the 16 A outlet marked (9A3000I only).
Note: The UPS charges the battery as soon as it is connected to the AC-power
source, even if “ON” button is not pressed.
Once the UPS is connected to the AC-power source, 24 hours of charging are required
before the battery can supply the rated backup time.
3.3 EBM Tower 1-3KVA
!
CAUTION : The unit is heavy: wear safety shoes and use vacuum lifter preferentially
for handling operations.
A-Checking the accessory EBM
Discard the EBM users guide if you are installing the EBM with a new UPS at the
same me. Use the UPS users guide to install both the UPS and the EBM.
If you ordered other UPS accessories, refer to specic user manuals to check the
packing contents.
9A
9A