EasyManua.ls Logo

Eaton 9A UPS - Ebm Rack 1-3 Kva

Eaton 9A UPS
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
9A UPS 1-3K
C-UPS Connecon
!
Check that the indicaons on the name plate located on the top of the UPS meets
to the AC-power source and the true electrical consumpon of the total load.
1. For 9A1000IR and 9A2000IR connect the UPS input socket
to the AC-power source
using the cable of the protected equipment. For 9A3000IR connect the cable
(250V-16A) to
the socket
, then to the AC- power source.
2. Connect the loads to the UPS using the cables
.For 9A3000IR model, connect high-pow-
er devices to the 16A outlet
.
Note: The UPS charges the baery as soon as it is connected to the AC-power
source, even if “ON” buon is not pressed.
Once the UPS is connected to the AC-power source, 24 hours of charging are required
before the baery can supply the rated backup me.
3.5 EBM RACK 1-3KVA
A-Checking the accessory kit
3
1
2
9A
EBM
Moun�ng kit for 19-inch
enclosures
Instruc�ons and Safety
Informa�on
Quick start
Rack kit for 19-inch 4-post
enclosures
1
3
5
4
2
1
2
3
4
5

Related product manuals