15
9A UPS 1-3K
B-Installaon
Installaon in rack posion
Follow steps 1 to 4 for module mounng on the rails.
1. Aach rail on the back of the rack.
2. Aach the rail on the front of the rack using the two holes at the boom.
3. Aach the mounng kit plate to the UPS.
4. Place the UPS on the rails and x the mounng plate to the top hole of the rail.
The rails and necessary hardware are supplied by Eaton.
1
2
3
9A
4
9A